Electric cars are becoming more popular in Bangladesh. They are better for the environment and can save money on fuel. As more people use electric vehicles (EVs), charging stations are becoming more important. Many people now want to know the cost of setting one up.
So, how much is EV charging station in Bangladesh?
The cost starts as low as BDT 2,550 for basic home chargers. Level 2 chargers average around BDT 104,000, while fast commercial stations can exceed BDT 1,575,000. Public charging typically costs BDT 7–10 per kWh.
Want to know more about installation, types of chargers, and what’s best for you? Keep reading to find out!
How Much is EV Charging Station in Bangladesh?
Type of Station/Charger | Price Range (BDT) | Typical Use Case |
Basic Charging Station | 2,550 – 17,990 | Home/small commercial |
Level 2 Charger (7.68 kW) | ~104,159 | Commercial/home |
DC Fast Charger (80 kW) | 1,575,000 | Public/commercial |
Bangladeshi EV charging station prices generally start at BDT 2,550 and can go up to BDT 17,990, depending on their features. Level 2 chargers cost around BDT 104,159, while DC fast chargers for commercial use can reach BDT 1,575,000. High-capacity options from brands like Global Cynax range from 20 kW to 240 kW with higher prices.
The Factors Influencing EV Charging Station Prices in Bangladesh
Factor | Impact on Price |
Charger Type (AC/DC, speed) | Higher speed/technology = higher cost |
Electricity Tariffs | Regulated by BERC, varies by location and use |
Location | Urban = higher cost; rural = lower but less reliable |
Infrastructure & Land | Major contributor to the total cost |
Government Policy | Incentives can reduce costs, but compliance adds |
Operations & Maintenance | Ongoing costs affect pricing for consumers |
Renewable Integration | Higher initial cost, lower long-term energy expense |
Electric vehicles are becoming more common in Bangladesh, and the need for charging stations is growing fast. However, setting up a charging station is not just about buying equipment. Many different factors affect the total cost, both at the start and while running the station.
Type of Charging Station and Technology
- AC chargers, used in homes or small offices, are more affordable and need simple parts for installation. DC fast chargers give quick results but cost more because they use complex systems and higher power.
- Fast DC chargers work better for commercial stations but come with higher power needs and more expensive maintenance. Slow chargers are cheaper but not suitable for busy public places or fast turnarounds.
Charging Speed and Capacity
- Low-power chargers are budget-friendly and ideal for light daily use, but they take longer to fully charge. Higher-capacity chargers above 80 kW give quick results but cost a lot more to run.
- Large EV fleets or highway stations need faster charging, pushing costs higher with added installation and energy requirements. Smaller units suit home use where time is not a big concern.
Electricity Rates and Tariffs
- The official tariff set by BERC is 7.70 BDT per kWh, with added monthly demand charges of 40 BDT per kW. These rates change often, depending on policies, power demand, and fuel prices.
- Home charging usually costs between 5.50–8.00 BDT per kWh, while public stations charge 15.00–20.00 BDT per unit. These gaps reflect the extra charges and commercial supply rates at public sites.
Location and Accessibility
- Urban areas may have high land costs and better roads, which increase the total setup cost for each station. On the other hand, rural zones face fewer fees but lack strong grid systems for high-power needs.
- Areas near shopping malls or city junctions can charge more due to convenience and customer flow throughout the day. Remote sites may offer cheaper service but draw fewer users and slower returns.
Infrastructure and Installation Costs
- Buying land and building the station can cost millions, especially in crowded areas with high real estate prices. The full cost may cross 4.2 million BDT with construction, permits, and grid connections.
- Places without a strong electric supply need grid upgrades that demand extra funds, time, and government approvals. Planning ahead helps reduce delays and lower risks during large builds.
Government Policies and Incentives
- Policy changes, such as tax breaks or grants, can lower startup costs and attract investors for new stations. However, the rules change often, and not every station qualifies for support.
- Safety checks and regular audits raise costs but also keep the system safe for drivers and station owners. Ignoring these rules could lead to fines or forced shutdowns.
Operational and Maintenance Costs
- Regular staff training, equipment checks, and system updates add up to long-term costs that are easy to miss. These services keep the station running well and reduce breakdowns.
- Demand charges grow with peak power use, making it important to track energy flow and customer patterns daily. Smart systems help manage power and avoid large bills each month.
Integration of Renewable Energy
- Solar panels reduce power bills in the long run, but they need a big upfront investment for setup and storage. Some stations now mix solar power with the grid to balance costs.
- Using solar energy also protects against power cuts, which is helpful in remote places with poor electricity service. It makes EV charging stations in Bangladesh more reliable in the long run.
Why are Public Charging Stations More Expensive Than Home Charging Options in Bangladesh?
Electric cars are getting more common in Bangladesh. More public charging stations are also being built in many places. But public charging costs more than charging at home. This happens for a few clear and simple reasons.
Public Charging Has More VAT
The VAT for public charging is 20%, while home charging has only 5%, which makes a big price gap. People pay more when they charge outside because of the high tax difference in the system. Charging at home is cheaper since the VAT is much lower for household users. That’s one big reason why public charging feels more costly.
Running Public Stations Costs More
Public stations have bigger machines and many other parts, which need more money to take care of. These places use more power, need workers, and face higher bills every single month. Home chargers don’t have those extra problems, which is why they cost less. The public price includes all those extra things the business must pay.
Businesses Need to Make a Profit
Companies run public charging stations that need to make money from each car they charge. At home, you only pay for the power you use—nothing more than that. Station owners must pay for tools, staff, service, and other bills every month. To cover all of that, they add a little extra to the price you pay.
Fewer Charging Stations Mean High Price
Not many public charging stations are open yet in most areas of Bangladesh. Because there are few choices, each one can charge a higher price without losing customers. In the future, more stations will open and bring fair prices for people. For now, the small number of stations keeps prices high.
Fast Charging Costs More to Give
Public charging stations charge cars faster than home chargers, but that speed comes at a higher cost. Fast charging uses big machines and more power, which makes it cost more to run. People often pay extra for that speed when they are in a hurry. That extra cost shows up in the final price at the station.
How Does Battery Size Influence EV Charging Station Prices in Bangladesh?
Battery Size (kWh) | Charging Cost (BDT) | Required Charger Type | Impact on Station Price |
Small (20–30) | Lower | AC/Slow | Lower |
Medium (40–60) | Moderate | AC/Level 2/Slow DC | Moderate |
Large (70+) | Higher | DC Fast | Higher |
Battery size plays a big role in how much EV charging stations cost to build and operate in Bangladesh. Bigger batteries need more power, stronger machines, and a longer time to charge. These needs affect pricing, station setup, and daily use in different ways.
Charging Costs Increase With Battery Size
- Big batteries need more electricity per charge, which makes the total cost higher each time someone plugs in. A 60 kWh battery will cost about double the amount to charge than a 30 kWh one.
- The cost follows a simple formula that includes battery size, energy rate, and how efficiently the charge is delivered. If battery capacity increases, the total price at the station also goes up quickly.
Hardware Must Match Battery Needs
- Larger batteries often need DC fast chargers that give more power and reduce waiting time during long trips. These chargers cost more to buy and also need extra space, stronger wiring, and cooler parts.
- For proper EV charging compatibility and AC power, stations must upgrade machines and systems to support large-battery EVs. This means more money is spent on building the station and connecting it to the local grid.
Bigger Batteries Affect Daily Operations
- Charging bigger batteries takes more time unless fast chargers are used, which slows down the number of cars served. This delay can reduce profits per hour and lower how many of users a station can support.
- Stations that serve many large EVs may face high monthly demand charges based on their power usage. These extra bills raise operating costs and can affect how much the station earns.
Business Models Must Adjust for Battery Size
- To keep profits stable, station owners may charge by the minute, kWh, or set a flat session price. These choices help balance time use and electricity costs between big and small battery EVs.
- In areas where long-range EVs are common, stations may build bigger setups with faster service. These upgrades cost more but are needed to serve users who expect speed and comfort.
Roles of Electricity Rates in Setting EV Charging Station Costs in Bangladesh
Electricity rates shape how much it costs to charge electric vehicles across different stations in Bangladesh. These rates impact not only the price drivers pay but also the profits charging stations make. From business plans to consumer habits, power pricing plays many roles in the EV system.
Charging Prices Depend on Electricity Rates
The price per unit of power decides how much drivers pay when they charge their electric vehicles at stations. In Bangladesh, station owners follow BERC rates, which are currently set at 7.70 BDT per kWh. This base cost grows with added fees, especially during busy hours when demand is high. Public charging often costs more than home charging due to extra charges and higher service needs.
High Power Rates Raise Station Costs
Charging station owners must pay more when power rates increase, which raises daily running costs over time. Many stations charge extra fees to cover these rising bills and stay in business. Fast chargers use more power quickly, which increases demand charges every single month. Owners must manage these extra costs or pass them on to users who need quick charging.
Demand Charges Affect Fast Charging Plans
Fast chargers pull a lot of energy fast, which increases the station’s peak power draw and demand bills. These charges are fixed monthly costs that depend on how much power a station uses at one time. For example, 40 BDT per kW monthly adds up quickly if usage stays high. Operators must balance power use to avoid large bills and protect profits.
Time-Based Rates Change Charging Habits
Electricity prices change across the day, with lower rates during off-peak or super off-peak hours at night. Users may try to charge during these cheaper times to save money on each session. Stations may also offer lower prices at night to attract more users during slower hours. Peak-time rates can reach 18.97 BDT per kWh, which is much more than off-peak rates.
Different Locations Have Different Prices
Power prices change by area, so home charging is usually cheaper than charging at public or business spots. Public stations pay more for power, which means higher fees for users who charge there. Some remote places with weaker grids may charge more to cover local costs and upgrades. These location-based price gaps affect where people choose to charge their vehicles most often.
Special Tariffs and Green Power May Help
New plans like solar-powered stations are being tested to lower long-term costs by using less grid electricity daily. Battery swapping stations may also get lower rates if new policies are approved to support more options. These changes show how flexible pricing can open doors for cleaner and cheaper EV support systems. Smart pricing plans could improve both business returns and user savings.
How Do Location and Infrastructure Impact EV Charging Station Price in Bangladesh?
An EV charging station’s total cost is greatly affected by where it is built in Bangladesh. Land, electricity, and setup work can all increase or decrease the price. City and village areas have very different costs and power needs. It’s critical to understand these things before starting a station. Here are the key factors:
- Land Price: Land in cities costs more than land in village areas, which makes urban charging stations more expensive. Busy places like malls or highways also charge more because many people want to use those spots.
- Grid Connection: Some places have strong power lines, which makes it easier to run chargers without extra work or spending. If the power lines are weak, owners must spend more to fix them before using the station.
- Charging Technology: Level 2 chargers are cheaper and slower, while DC fast chargers cost more but charge cars much faster. Adding more chargers means more wires, machines, and space, which raises the total cost a lot.
- Site Preparation: Before building, the land must be ready, which requires digging, wiring, and some building work to fit the chargers. If the power grid is old, connecting the station also costs more and takes longer.
- Maintenance Needs: Fixing machines, checking parts, and doing cleanups cost money every month to keep the station working well. Adding solar power raises the starting cost but can save money in the future.
- Government and Rules: Some stations get money from the government to help pay for early costs and make the setup easier. Getting all the needed papers and following safety rules can still take time and raise costs.
- Electricity and Fees: Public stations pay more for power than people who charge cars at home, making public charging more costly. Owners may also add service fees, which change depending on how much power people use.
What Steps are Bangladeshi Governments Taking in Establishing EV Charging Stations?
Bangladesh is working to build more electric vehicle (EV) stations across the country. These steps help people use EVs and keep the air clean. The government has made some plans to support EV growth.
Making Charging Rules
The Power Division is making sure all EV stations follow safety and power rules. New guidelines tell people how to set up and run EV stations. These rules help keep charging safe, easy, and not too costly. All stations must also follow local electricity codes and safety laws.
Fixing Power Prices
Power prices for EV charging are set by the government to benefit both drivers and station owners. Right now, the price is 7.70 BDT for each unit of electricity. More rules are coming for battery swapping stations to grow this part too. These rules also help with keeping the EV station setup cost low for business owners.
Helping Local Factories
The government wants EVs and parts made inside the country to save money and create jobs. They are giving tax cuts and other help to people who build EVs locally. One company, Nitol Motors, is building big plants to make electric vehicles. This helps more people buy EVs at better prices.
Building New Stations
More charging spots are needed in busy places like Dhaka because EV use is growing fast. The government is building many new stations to meet that need. They also plan to use solar power at 30% of stations by 2030. These stations will be built where people can reach them easily.
Keeping Safety Rules
All EVs brought into the country must follow safety and environmental rules. Old EV batteries must be thrown away or recycled the right way. This helps protect the land, water, and people from harm. Every EV must pass safety checks before going on the road.
Setting EV Targets
By 2030, the goal is for 15% of all vehicles to be electric in Bangladesh. The long-term plan is to have 30% EV use and less air pollution. City leaders want to replace fuel vehicles with electric ones by 2050. These goals help the country stay clean and green.
Involving Private Companies
The government wants more private companies to build EV stations and make EVs. They are giving help, like easy loans and permits for these projects. This makes it easier for businesses to start and grow. More private help means more EV stations and better service for users.
FAQs About the Pricing of EV Charging Stations in Bangladesh
Electric vehicle (EV) charging stations are becoming more common in Bangladesh as EV use continues to grow. Many people are asking about the cost and what factors matter when setting one up. Here are 8 helpful FAQs to guide you.
What is the Average Cost of a Home EV Charger in Bangladesh?
Basic home EV chargers in Bangladesh cost between BDT 2,550 and BDT 17,990, depending on the model and features. These chargers work well for personal use and are easy to install without needing major upgrades to your home’s electrical system.
How Much Does a Commercial EV Charging Station Cost?
Commercial EV stations cost much more, starting from BDT 1,000,000 and can go above BDT 1,575,000. The price includes land, fast chargers, wiring, labor, and sometimes solar power, depending on the location, charger type, and station size.
Are Solar-Powered Charging Stations More Expensive?
Yes, solar-powered EV charging stations usually cost more at the start due to panels, batteries, and extra equipment. However, they help reduce electricity bills later and are more eco-friendly, especially in areas with power cuts or expensive grid rates.
What are the Ongoing Costs After Installation?
After setting up, monthly costs include electricity bills, equipment maintenance, demand charges, and sometimes staff wages. These costs vary by charger type and location, but they must be managed carefully to keep the station running smoothly and profitably.
How Much Does It Cost to Charge an EV in Public Stations?
Charging at public stations in Bangladesh usually costs between BDT 7 to BDT 10 per kWh, depending on the provider. Peak-hour pricing and extra service charges may raise the final cost, especially when using fast or high-capacity chargers.
Do EV Charging Costs Change by Area?
Yes, urban stations often have higher setup and running costs due to expensive land and power demand. Rural stations are usually cheaper to set up, but limited power access and fewer users can affect the station’s overall income and pricing.
How Does Charger Speed Affect The Price?
Faster chargers like DC fast chargers cost more to buy and install than slower Level 2 chargers. They also use more power in less time, which increases electricity bills and demand charges, making them costlier but more convenient for users.
What Factors Affect EV Charging Station Pricing The Most?
The top factors include land cost, electricity rates, charger type, grid connection fees, and government rules. These can greatly change the total price, so planning with a clear budget and choosing the right location are key for success.
Final Thoughts
Electric cars are growing fast in Bangladesh, and more charging stations are needed every day. Prices can be very different based on what type you choose and where you install it. Knowing how much is EV charging station in Bangladesh depends on things like battery size, location, power rates, and setup work.
Home chargers are cheaper, but public stations cost more because they need bigger machines and more power. Government help and new plans are making it easier for people to build and use EV stations. If you want to switch to electric, now is a good time to learn and plan ahead.